⚠ Internal · Core COE daily standup · diff window = Tue 2026-06-23 (00:00–24:00 Asia/Dubai) · source: Jira (algento, project COR).
← Lighthouse Briefings · Daily · 2026-06-24
Daily Standup · COE

Core COE Daily Standup · Sprint 22

Activity on Tue 2026-06-23 · grouped by owner · Hui Liu · (kai.wang carried from 06-22)
Project COR (whole team) · Risk 🔴 High / 🟡 Med / 🟢 Low — severity/blocker/dependency/process, not schedule · 🐛 Bug 📋 Task · openSprints() empty → window = updated 2026-06-23
· Owners with activity 1· Tickets touched 1· Quiet day — one daily-report update, 0 status changes

🚩 Action summary

Activity in window (by owner)

OwnerWork itemOwner / status ΔActivity (📦commit / 💬comment)🚩 Action
Hui Liu
·1
📋 COR-361 [Voice Bot] SME Lending — server side[语音机器人] SME Lending — 服务端 — no Δ in window (In Development since 06-17) 💬 daily report (70%, updated 06-23): updated comms-protocol definitions; aligned message format & API contracts across open-call / meeting-media / meeting-service
💬 developing user-callback in open-call (in testing); validating end-to-end callback flow in UAT
🟢 finish callback + UAT validation

Team status — carried from 06-22 (no movement on 06-23)

OwnerWork itemStatusLast reported🚩 Watch
kai.wang
·3
📋 COR-367 Migrate users to new gateway — Phase 3用户迁移至新 TCPAccess 网关 — 第三阶段 In Development · 90% 💬 06-22: AppCenter port-config connection-limit fixed via ops, re-released, ramped 85% → 90% of users on the Java gateway 🟢 next ramp step
📋 COR-359 FPM — Data InsightFPM 数据洞察 In Development · 60% 💬 06-22: 6 services with FPM integration released to prod; FPM dashboard design started 🟢 continue rollout + dashboard
📋 COR-372 TCP Phase 2 — Rust testing in UAT/PRODTCP 第二阶段 — Rust 在 UAT/PROD 测试 In Development · 90% 💬 06-21: UAT perf/functional tests passed; uidrgs routes gRPC to the Rust gateway. Blocked on production AppCenter config (Konghui) 🟡 unblock prod AppCenter config

Notes

openSprints() returns empty for COR (no formally-started sprint), so the window is updated >= 2026-06-23 AND < 2026-06-24. Only COR-361 registered activity on 06-23 — the 06-22 daily report was edited to reflect 70% progress; no status or owner transitions occurred project-wide on 06-23.
kai.wang's three gateway / FPM tickets last reported on 06-22 (22:47) and did not move on 06-23 — shown above as carried state for continuity. The only standing risk is the COR-372 production rollout waiting on the production AppCenter config from Konghui. No bugs open at end of day.